Nereda design capacity

  • 58223 m3/d
    Dry Weather Flow
  • 3545 m3/h
    Peak Flow
  • 232850 PE
    PE (PE = 60 gBOD/d)

Project facts

  • Client
    BRK Ambiental - Limeira
  • Licensee
    BRK Ambiental 
  • Location
    Tatu, Limeira, Brazil
  • Period
    2019
  • Wastewater
    Municipal
  • Project type
    Greenfield 
  • Process configuration
    Pre-treatment + Primary settler + Nereda + UV

About Tatu Nereda® WWTP – Brazil

Tatu is situated to the southeast of the city of Limeira. It is in the eastern part of the Brazilian state of São Paulo, 154 km from the state capital.

The challenge

Due to increased population and the introduction of more stringent legislation, the wastewater treatment plant (WWTP) in Tatu near Limeira needed to be extended in order to secure water quality of the nearby River Tatu. The wastewater treatment plant at Limeira serves a population equivalent of 232,850. The plant endured frequent flooding, due to high water levels in the River Tatu. There was also the possible highly toxic concentrations of heavy metals in the water due to local metallurgic companies operating in the area.

Brazil - Tatu, Limeira | Royal HaskoningDHV
Image: aerial overview of the current wastewater treatment plant in Limeira

The solution

Main contractor BRK Ambiental employed Nereda technology on the site, as part of the major upgrade to the facility. As a way of mitigating against the flooding of the plant, the site equipment and instruments had to be installed in a secure place. The existing wastewater treatment plant has been upgraded with biological treatment, using Nereda technology, with pre-treatment 3 mm screens and efficient O&G removal installed. The three Nereda reactors are downstream of the existing primary clarifier. Because of differences in height, the reactors are fed by gravity flow, which results in efficient energy consumption.

The outcome

In addition to delivering an extended basic design and a Nereda Controller, Royal HaskoningDHV reviewed the client’s detailed design and supported the client with commissioning, start-up and five years of operation of the new plant. BRK operates the plant and the facility’s cost-efficiency – CAPEX as well as OPEX – is a very important feature.

Nereda in brief

  • Cleaner water outcome
  • Cost-efficient solution
  • Manages increased capacity
  • Retrofitted technology
  • Sited to prevent flooding.

THE LOCAL BENEFITS OF THE PROJECT

  • Significant cost savings

  • Environmental benefits

  • Operational flexibility

  • Green and sustainable

  • Increased treatment capacity