Nereda design capacity

  • 3730 m3/d
    Dry Weather Flow
  • 360 m3/h
    Peak Flow
  • 21000 PE
    PE (PE = 60 gBOD/d)

Project facts

  • Client
    Municipality of Strömstad
  • Location
    Strömstad, Sweden
  • Licensee
    2018
  • Wastewater
    Municipal
  • Project type
    Greenfield 
  • Process configuration
    Pre-treatment + Primary settler + Nereda

About the Strömstad Nereda WWTP

Designing a wastewater treatment plant for the municipality of Strömstad is challenging for two reasons. First: Strömstad is located in a very touristic area of Sweden, which means that the variation in loading is large throughout the year. Second: the low temperatures during the winter may not affect the treatment results.