Nereda design capacity

  • 3668 m3/d
    Dry Weather Flow
  • 630 m3/h
    Peak Flow
  • 9109 PE
    PE (PE = 60 gBOD/d)

Project facts

  • Client
    Water Authority Limburg
  • Location
    Simpelveld, The Netherlands
  • Period
    2016
  • Wastewater
    Municipal
  • Project type
    Greenfield 
  • Process configuration
    Pre-treatment + Nereda + Sand filtration

About the Simpelveld Nereda WWTP

Waterschap (water authority) Limburg has decided to replace the Simpelveld wastewater treatment plant acoording to the Verdygo concept. 

The official opening of the Simpelveld Verdygo Wastewater treatment plant on YouTube (NL)