Nereda design capacity

  • 18586 m3/d
    Dry Weather Flow
  • 1850 m3/h
    Peak Flow
  • 92897 PE
    PE (PE = 60 gBOD/d)

Project facts

  • Client
    United Utilities
  • Location
    Kendal, United Kingdom
  • Licensee
    2018
  • Wastewater
    Municipal
  • Project type
    Greenfield Brownfield Retrofit
  • Process configuration
    Pre-treatment + Nereda + Disc filtration + UV

About Nereda® at Kendal Wastewater Treatment Plant in UK

Kendal is a market town in the South Lakeland District of Cumbria, England, which lies in the valley of the River Kent.

The challenge

Population increases meant that Kendal WWTP was required to treat a population equivalent of 103,000. This meant that United Utilities (UU) needed a solution to improve its wastewater treatment quality at Kendal WWTP, to enable it to achieve regulatory compliance, while reducing its operational cost.

The solution

UU selected LiMA to deliver the project and work closely with Nereda technology provider Royal HaskoningDHV. Kendal WWTP was UU’s first full-scale application of Nereda technology, following an intensive review period. The application of the Nereda technology is part of its drive to reduce operational costs across its wastewater operations.

The outcome

Kendal WWTP was operational and already achieving exceptional performance prior to UU’s March 2019 compliance date. Nereda offers a number of advantages over conventional activated sludge, due to the nature of the granules. Contrary to conventional processes, bacteria concentrate into a compact granular structure with excellent settling characteristics. The compact structure also leads to the formation of different zones which provides the optimum conditions for simultaneous nitrification and denitrification as well biological phosphorus removal.

Nereda® WWTP in Kendal, UK - Opening

THE LOCAL BENEFITS OF THE PROJECT

  • Compact footprint

  • Delivers high-quality effluent standards

  • Low power requirements

  • Sustainable costs

  • Increased treatment capacity