When Watermaatschappij Limburg (WML) developed a new modular water process, it needed a building that would support the internal process and which could be re-sized in line with changing demand. Flexibility required to meet changes in production volumes.
Our Building Technology team was contracted to design the building to house this new process. Close coordination with our water process engineers ensured our client could rely on a building which supported and structured the process, while incorporating the flexibility needed to respond to changes in production requirements.
Building optimised for the process
Every element of the building supports the process. The design ensures process elements are structured and assembled in the right place and that the pipework is well organised. It is through our understanding of the process that we are able to create a design in which building and process work together.Jurgen Boonstra
Architect, Royal HaskoningDHV
The building includes façades and a roof which can be removed to provide the required flexibility. In addition the building incorporates inspection areas for viewing the module from various angles and heights.
Learn more about Building Technology or download our publications
Project facts
- ClientWML
- ChallengeTo design the new building.
- SolutionClose coordination with the water process engineers of Royal HaskoningDHV ensured the client could rely on a building which supported and structured the process, while incorporating the flexibility needed to respond to changes in production requirements.