- Owner’s Engineer Services: general/technical project development support
- Feasibility Study input: LNG Terminal Zone Layout Development (Pre-FEED)
- Reference Design input and Contract Package Development (FEED)
Although the project was put on hold in 2015 as a result of the fall in international oil and gas prices during 2014, the concept is still deemed highly viable.