The Royal HaskoningDHV team first completed an initial market study and a site selection report. The team established a masterplan and tender design for the shipyard, which provided an efficient and productive operational layout for the ship repair and shipbuilding activities.
The design included marine civil engineering, dredging, navigation, workshops, office buildings, roadways, paving, mechanical and electrical (M&E) elements. A 3D computer visualization of the shipyard was created together with a 2m x 3m physical model. Project facts
- LocationNorth Africa
- ChallengeMaking the shipyard capable of repairing two Very Large Crude Carrier (VLCC) vessels in two large dry docks
- SolutionA masterplan and tender design
- TeamMaritime