As part of the Marine Framework and the first outfall asset to require replacement, Yorkshire Water Services (YWS) appointed Royal HaskoningDHV to provide the technical support for the replacement and renewal of Wheatcroft Outfall, situated 3km south of Scarborough on the North East coast of England. The existing Wheatcroft Outfall was a 357mm steel pipeline, discharging effluent from a food processing factory. The outfall had reached the end of its operational life. Royal HaskoningDHV were required to provide the Concept Design, Survey / Site Investigation Specifications and Technical Construction Support and Supervision for the Wheatcroft outfall replacement works.
Considering the requirements of Yorkshire Water, Royal HaskoningDHV provided the Design and Tender documents for a 2.5km long, 355mmOD PE replacement outfall to allow them to procure the suitable contractor from the marine framework.
The solution included:
Royal HaskoningDHV developed an excellent working relationship with Yorkshire Water Services, providing a high-quality, professional service and helping to deliver a successful project. The project was delivered on time and to budget, furthering the strong client relationship. Wheatcroft Outfall was a crucial project for Yorkshire Water, as the first asset to be replaced under the new Marine Framework.